Friday, November 25, 2011

Behind The Wall–Part 2

I told some of you how the quick draws on the lead routes are supported behind the walls at VE. I got a photo the other day of this. The quick draw on the front of the wall is on an anchor which is through bolted (then the nut is welded shut) to a steel bracket on the back side of the wall. The steel bracket is welded to the structural steel that hold up the walls.

2011-11-23 10.26.49

No comments: